Replacing windows and doors can need building regulations approval in England. A registered competent person installer can self certify the work and must give you a certificate within 8 weeks, which then shows in solicitors' searches. External doors less than half glazed are exempt, and replacing glazing units is excluded from the general repairs exemption.
Do new windows need approval?
Replacing windows and doors can need building regulations approval in England. Whether your particular job needs it depends on the work you are having done and on how it is carried out, so confirm the position with your local council before work starts. Approval is a separate matter from planning permission, and the two are handled differently.
Some work falls outside approval. External doors less than half glazed are exempt, so a mostly solid external door does not need approval on that basis. Replacing glazing units is excluded from the general repairs exemption, which means a straight unit swap is not automatically covered by the repairs route. Treat each element of the job separately when you assess what applies.
The practical step is to describe the work precisely to the council or to a registered installer and ask which parts need approval. Keep the answer in writing with your property papers. If the work is done without approval, you may lack certificates needed when selling, and that gap surfaces during the buyer's searches.
Using a registered installer
A registered competent person installer can self certify the work rather than you applying to the council separately. The installer must give you a certificate within 8 weeks of the work. That certificate is the evidence that the work was notified and signed off under the scheme.
The certificate matters later. It shows in solicitors' searches when you sell, so the buyer's solicitor can see the work was certified. Keep the certificate with your property documents rather than filing it away with general household paperwork. If you move, the certificate stays with the property's history.
Ask the installer before work begins whether they are registered to self certify the type of work you need. Confirm what certificate you will receive and when it will arrive. If the installer cannot self certify, approval may need to go through the council instead, and you should establish that before the work starts.
Doors and glazed doors
Doors are treated differently from windows. External doors less than half glazed are exempt, so the amount of glazing in the door decides whether the exemption applies. Measure or check the specification rather than assuming, because a door with a large glass panel may fall outside the exemption.
Replacing glazing units is excluded from the general repairs exemption. A job that is only a glazing unit replacement therefore needs its own assessment rather than being treated as an ordinary repair. This distinction matters when a door or window is being partly rebuilt rather than fully replaced.
Where a door or window combines frames, glazing and hardware, set out each element for the council or installer. The approval position can differ across the parts of one job. Record what was agreed so the paperwork matches the work actually done.
Certificates and selling
Without approval you may lack certificates needed when selling. Buyers' solicitors carry out searches, and certificates from registered installers show up in those searches. A missing certificate can hold up a sale while the position is resolved.
If a registered installer did the work, the certificate should reach you within 8 weeks. Check that it has arrived and that it describes the work accurately. Store it with the documents you will hand to your solicitor when you sell.
If you are buying, ask your solicitor what the searches show for windows and doors. The searches are the route by which certification is checked, so raise any gap early rather than after exchange. The council can confirm what records it holds for the property.
If work was done without approval
Regularisation can approve work done after 11 November 1985. This is the route for work carried out without approval that is later brought into the system. The date is fixed, so work before it is not covered by regularisation.
Apply to the local council for regularisation and expect the council to inspect the work as part of the process. The council decides what it needs to see and what evidence it will accept. Ask the council what it requires before you submit anything.
If you are buying a property and the searches show no certificate, ask the seller and your solicitor about regularisation. The outcome depends on the council and on the state of the work. Do not assume a missing certificate means the work is unacceptable, and do not assume it will be approved either.
Planning in protected areas
Planning is separate from building regulations. Councils can remove permitted development rights with an Article 4 direction, and earlier permissions may have removed them. Check with the council first before relying on any permitted development position for windows or doors.
Article 2(3) land has tighter rules. This covers National Parks, the Broads, Areas of Outstanding Natural Beauty, conservation areas and World Heritage Sites. If your home is in one of these areas, the planning position for replacement windows and doors needs checking with the council.
Ask the council whether an Article 4 direction or an earlier permission affects your property, and get the answer in writing. Keep that response with your property papers alongside any building regulations certificate. The planning answer and the building regulations answer are separate, and you may need both.
General information, not professional advice. Rules vary by council and change over time; check with your local authority or a qualified professional before starting work or buying.
Frequently asked questions
Does replacing windows need building regulations approval in England?
It can. Replacing windows and doors can need building regulations approval, depending on the work. Confirm the position with your local council or a registered installer before work starts, and keep the answer with your property papers.
How quickly must a registered installer give me a certificate?
A registered competent person installer self certifies the work and must give you a certificate within 8 weeks. Keep it with your property documents because it shows in solicitors' searches when you sell.
Are any doors exempt from approval?
External doors less than half glazed are exempt. The amount of glazing in the door decides whether the exemption applies, so check the specification rather than assuming a door qualifies.
Can work done without approval be regularised?
Regularisation can approve work done after 11 November 1985. Apply to the local council, which will set out what it needs to inspect and what evidence it will accept. The outcome depends on the council.
Do protected areas have different planning rules?
Article 2(3) land, which includes National Parks, the Broads, Areas of Outstanding Natural Beauty, conservation areas and World Heritage Sites, has tighter rules. Councils can also remove permitted development rights with an Article 4 direction, so check with the council first.
Sources
- GOV.UK: Building regulations approval
- MHCLG permitted development rights for householders, technical guidance
Checked 20 November 2026.